Project Name: Al Moya Solar Project, Taif, Saudi Arabia
Total size: 1,839 SQM
Desert Sides International successfully delivered a full set of customized portable cabins for L&T at Al Moya Solar Project. The scope included high-quality prefab units for the EPC, training and induction rooms, an experience center, staff mess, prayer halls, administration rooms, toilets, gatehouse and utility shelters.
Key units:
EPC Office: 478.17 m 2
Owner Office: 660.30 m 2
Induction Room & Mess Hall: 252.00 m 2
Prayer & Admin Cabins, Toilets, Shelters: Various units totaling over 1,839 m²
Highlights:
High Quality Portable Cabin
Designed to resist harsh weather conditions
Fully Integrated MEP services, lighting system and air-conditioning.
Offices, training, prayer, dining, and sanitation spaces that are designed with the specifications made to suit the needs of the client.
Light weight but strong structures guaranteeing mobility and low-cost maintenance